PARK, BEACH, &
RECREATION BOND INITIATIVE (PROP. A, 1996)
In November 1996, County
voters approved by a 65%-35% margin Yaroslavskys proposal to establish a $319
million park-and-open-space property assessment to fund the acquisition and preservation
of endangered wilderness lands, and to rehabilitate and improve dozens of park and
recreational facilities throughout Los Angeles County. Dubbed Baby A, the
measure was modeled on an earlier successful 1992 Prop. A parks measure which generated
$540 million in funding for park improvements and open-space preservation.
FINAL TEXT AS AMENDED ON JUNE 18, 1996
RESOLUTION
OF THE BOARD OF SUPERVISORS OF THE COUNTY OF
LOS ANGELES, ACTING AS THE LEGISLATIVE BODY OF THE LOS
ANGELES COUNTY REGIONAL PARK AND OPEN SPACE DISTRICT,
LEVYING AN ADDITIONAL ASSESSMENT WITHIN THE DISTRICT,
AMENDING THE METHOD OF ASSESSMENT, AND AUTHORIZING THE
EXPENDITURE OF DISTRICT REVENUES FOR ANY AUTHORIZED
PURPOSE, SUBJECT TO APPROVAL BY THE COUNTY ELECTORATE
WHEREAS, the County of Los Angeles (the "County") has
serious unmet needs for park, recreation, youth and senior facilities, and for positive
recreational alternatives for at-risk youth to assist in gang prevention and intervention
efforts, and contains irreplaceable park, recreation, beach, wildlife and natural open
space land; and
WHEREAS, on November 3, 1992, sixty-four percent (64%) of voters
within the County voting on the matter authorized formation of the Los Angeles County
Regional Park and Open Space District (the "District"), the levy of a benefit
assessment within the District, and a plan of expenditure of the proceeds of such
assessment; and
WHEREAS, the Board of Supervisors of the County, acting as the
legislative body of the District (the "Board"), finds and determines that the
development, acquisition, improvement, restoration and maintenance of parks, recreational,
cultural and community facilities and open space lands within the District confer a direct
and special benefit to all parcels within the District by improving economic,
environmental and recreational conditions resulting in maintained or enhanced property
values; and
WHEREAS, the Board further finds and determines that the public
interest and convenience require, and that it is in the best interest of the residents of
the County, that an additional assessment be levied within Landscaping and Lighting
District No 92-1, which is coterminous with the District, to fund the purposes of the
District consistent with the plan of expenditure set forth in the Engineer's Report
referred to below; and
WHEREAS, the County has many unique natural lands and is rich in
biological diversity, and it is necessary and important that these natural resources be
protected permanently and restored for the purposes of conserving biological diversity,
protecting the health of the County's environment and for the enjoyment of this and future
generations; and
WHEREAS, the Board further finds and determines that in order to
provide for a more equitable apportionment of the assessment among the several properties
within the District, the portion of any vacant parcel, and the vacant portion of any
partially improved parcel, in excess of two and one-half acres shall not be assessed, and
it is necessary and appropriate to amend the method of assessment to reflect the foregoing
change in the method of assessment of vacant or partially improved parcels which are
greater than two and one-half acres in size, as detailed in the Engineer's Report referred
to below; and
WHEREAS, the Board further finds and determines that it is in the
best interest of the residents of the County to permit the District to expend any of its
funds for any authorized purpose of the District, including the application of proceeds
derived from the original assessment within the District to the plan of expenditure for
the additional assessment set forth in this resolution, and vice versa; and
WHEREAS, a public hearing on the matters set forth in this
resolution was called and held on June 13, 1996, and this resolution shall not take effect
unless and until the question of approval of the matters set forth herein shall have been
submitted to the electorate of the County and approved by a majority of voters voting on
the question;
NOW, THEREFORE, BE IT RESOLVED by the Board of Supervisors of the
County of Los Angeles, acting as the governing body of the Los Angeles County Regional
Park and Open Space District, as follows:
Section 1. (a) This resolution is adopted pursuant to
Section 5539.9(d)(2) of the Public Resources Code of the State of California (the
"State"). The Board hereby adopts and approves the final engineer's report
relating to the Additional Assessment (the "Engineer's Report") and filed
with the Executive Officer-Clerk of the Board. The Additional Assessment shall be
levied within the District at a rate not to exceed the amount set forth in the Engineer's
Report, in accordance with the Engineer's Report and this resolution. The Engineer's
Report describes the boundaries of the assessment district, the locations of certain of
the improvements to be funded by the District, the method and rationale for spreading the
proposed Additional Assessment in proportion to the benefit received by each lot or parcel
of land within the District, and the proposed amendments to the method of assessment.
The Engineer's Report is by this reference incorporated herein as though set forth
in full at this place.
Section 2. As used in this resolution, the following terms
have the indicated meanings:
"Additional Assessment" means the assessment levied
within the District pursuant to this resolution.
"Board" is used as defined in the recitals to this
resolution.
"County" is used as defined in the recitals to this
resolution.
"Department of Beaches and Harbors" means the
Department of Beaches and Harbors of the County.
"Department of Children and Family Services" means the
Department of Children and Family Services of the County.
"Department of Natural History Museum" means the
Department of Natural History Museum of the County.
"Department of Parks and Recreation" means the
Department of Parks and Recreation of the County.
"Department of Public Works" means the Department of
Public Works of the County.
"District" is used as defined in the recitals to this
resolution.
"Engineer's Report" is used as defined in Section 1 of
this resolution.
"Financial Consultant" is used as defined in the Master
Indenture, and also includes the independent auditing firm described in Section 21(I).
"Master Indenture" means the Master Indenture of Trust
dated as of May 1, 1994, between the District and the Auditor-Controller of the County, as
fiscal agent.
"Natural Lands" means an area of relatively undeveloped
land which (a) has substantially retained its characteristics as provided by nature or has
been substantially restored, or which can be feasibly restored to a near-natural condition
and which derives outstanding value from its wildlife, scenic, open space, parkland or
recreational characteristics, or any combination thereof, or (b) meets the definition of
open-space land in Section 65560 of the California Government Code.
"1992 Assessment" means the assessment levied within
the District pursuant to the 1992 Order.
"1992 Order" means the order of the Board, as amended
on March 17, 1992, and approved by the voters of the County on November 3, 1992, pursuant
to which the District was formed and the first assessment levied therein.
"Nonprofit Organization" means any charitable
organization described in Section 501(c)(3) of the Internal Revenue Code of 1986, as
amended, which has among its purposes the provision of park, recreation or community
services or facilities, gang prevention and intervention, tree-planting, or the
conservation and preservation of wetlands or of lands predominantly in their natural,
scenic, historical, forested or open-space condition, or restoration of lands to a
natural, scenic, historical, forested or open-space condition.
"Park" means a tract of land with scenic, natural,
open-space or recreational values, set apart to conserve natural, scenic, cultural,
historical or ecological resources for present and future generations, and to be used by
the public as a place for rest, recreation, education, exercise, inspiration or enjoyment.
"Parks Fund" means the Los Angeles County Regional Park
and Open Space District Park Fund, into which all revenue generated by the District is
required to be deposited, in accordance with Section 21(e) of this resolution and Sections
21 and (d) of the 1992 Order.
"Public Agency" means any governmental agency
established pursuant to the laws of the State that is authorized to acquire, develop,
improve and restore real property for beach, wildlife, park, recreation, community,
cultural, open space, water quality, or gang prevention and intervention purposes.
"State" is used as defined in Section 1 of this
resolution.
"State Lands Commission" means the Lands Commission of
the State of California.
Section 3. The following funds shall be awarded for the
purposes set forth below, in amounts not to exceed the following:
(a) Sixty-nine million fifty thousand dollars ($69,050,000)
to the County for the acquisition, development, improvement, restoration or rehabilitation
of real property for recreational facilities, parks and park safety, gang prevention,
senior citizen recreation facilities, wildlife habitat, natural lands, improvement of
Santa Monica Bay, multi-use sports facilities, lakes, fishing and boating facilities,
trails, rivers and streams, significant ecological areas, equestrian facilities, and
museums and cultural facilities, in accordance with the following schedule:
(1) Fifty-one million fifty thousand
dollars ($51,050,000) to the Department of Parks and Recreation for the acquisition,
development, improvement, restoration or rehabilitation of real property for parks,
recreation, wildlife habitat or natural lands in accordance with the following schedule:
A. One hundred thousand dollars ($100,000) for
general improvements, including landscape and/or irrigation, at Amigo Park.
B. Six hundred thousand dollars ($600,000) for
improvements to County parks in accordance with the Americans with Disabilities Act.
C. Three hundred fifty thousand dollars ($350,000)
for acquisition and/or preservation of wetland habitat in the Antelope Valley, including
interpretive exhibits, public facilities and/or restoration.
D. Five hundred thousand dollars ($500,000) for
development of soccer facilities and/or general park improvements at Belvedere Park.
E. Seventy thousand dollars ($70,000) for security
improvements at Bethune Park.
F. One million two hundred thousand dollars
($1,200,000) for rehabilitation of the swim beach and/or general park improvements at
Bonelli Regional Park.
G. Three hundred thousand dollars ($300,000) for
development and improvement of recreation facilities, including development a
multi-purpose recreation facility, at Burton Park.
H. Three hundred thousand dollars ($300,000) for
improvements to the community center at Campanella Park.
I. Two hundred fifty thousand dollars ($250,000) for
general park improvements including security, landscape and/or irrigation improvements at
Castaic Sport Complex.
J. One million seven hundred thousand dollars
($1,700,000) for rehabilitation of swim beach and/or general park improvements to the
recreation and park facilities at Castaic Lake.
K. Two million ten thousand dollars ($2,010,000) for
expansion, development, and/or rehabilitation of facilities serving senior citizens or to
comply with the Americans With Disabilities Act (ADA) at parks in the Central area of the
County including, but not limited to Athens, Del Aire, and Keller Park.
L. One million three hundred ninety-six thousand
dollars ($1,396,000) for renovation and/or general improvements to park and recreation
facilities at Cerritos Park.
M. Two million dollars ($2,000,000) for development
and/or general improvements, including development of gymnasium/community activity
facility, at City Terrace Park.
N. Two hundred fifty thousand dollars ($250,000) for
security and/or general improvements at Devils Punchbowl.
O. One million six hundred fifty thousand dollars
($1,650,000) for expansion, development, and/or rehabilitation of facilities serving
senior citizens or to comply with the Americans With Disabilities Act (ADA) at parks in
the East Los Angeles and San Gabriel Valley areas including, but not limited to, Avocado
Heights, Basset, Salazar, Atlantic Blvd., and/or Belvedere.
P. One million seven hundred thousand ($1,700,000)
for development, rehabilitation and/or general improvements at El Cariso Park.
Q. One million five hundred thousand dollars
($1,500,000) for rehabilitation and/or general park improvements at Franklin D. Roosevelt
Park.
R. Two million two hundred seventy-four thousand
dollars ($2,274,000) for development of community recreation facilities and/or general
improvements to the facilities at Gunn Avenue Park.
S. One million dollars ($1,000,000) for renovation of
campground and/or general park improvements at Hart Regional Park.
T. One million five hundred thousand dollars
($1,500,000) for development of regional pool facilities and/or other park improvements at
Jackie Robinson Park.
U. One million seven hundred forty-eight thousand
dollars ($1,748,000) for development, rehabilitation and/or other general park
improvements at Jesse Owens Park.
V. One million five hundred thousand dollars
($1,500,000) for general renovation and improvements to facilities at John Anson Ford
Theatre.
W. One million three hundred ten thousand dollars
($1,310,000) for renovation and/or general improvements at La Mirada Park.
X. Four hundred thousand dollars ($400,000) for
development and/or general improvements at Ladera Park.
Y. One hundred twenty-five thousand dollars
($125,000) for development and/or improvement of recreational facilities at Lake Los
Angeles which are open and accessible to the public.
Z. Five hundred thousand dollars ($500,000) for
development, improvements and/or expansion at Lennox Park.
AA. One million two hundred thousand dollars ($1,200,000)
for development of gymnasium/community activity facility and/or general improvements at
Loma Alta Park.
BB. Five hundred fifty thousand dollars ($550,000) for
rehabilitation, renovation, development and/or general improvements at Los Robles Park.
CC. Six hundred thousand dollars ($600,000) for development
of sports complex and/or general improvements at Magic Johnson Park.
DD. Eight hundred ten thousand dollars ($810,000) for
rehabilitation and/or general improvements at Manzanita Park.
EE. Two hundred thousand dollars ($200,000) for
improvements to the campground at Marshall Canyon Regional Park.
FF. Two hundred fifty thousand dollars ($250,000) for
rehabilitation of park facilities at Mona Park.
GG. Three million seven hundred thousand dollars
($3,700,000) for acquisition, development, rehabilitation and/or general improvements of
parks, natural lands and/or recreation facilities in the North County area, including but
not limited to George Lane and Charles White Parks, and including but not limited to, the
communities of Acton, Altadena, Littlerock and Pearblossom.
HH. One million five hundred thousand dollars ($1,500,000)
for development of regional pool facilities and/or other park improvements at Pamela Park.
II. Two hundred thousand dollars ($200,000) for
refurbishment of picnic areas and camp grounds and/or general improvements at Peck Park.
JJ. Five hundred thousand dollars ($500,000) for
acquisition, development, security improvements and/or general improvements at Placerita
Canyon County Park.
KK. One hundred twelve thousand dollars ($112,000) for
development and/or general improvements at Rogers Park.
LL. Three hundred thousand dollars ($300,000) for
development, refurbishment, rehabilitation and/or general improvements at Rosas Park.
MM. One hundred thousand dollars ($100,000) for
refurbishing hard courts and/or lighting at Rowland Heights Park.
NN. One hundred thousand dollars ($100,000) for development
and/or general improvements to facilities at San Dimas Park.
OO. Five hundred thousand dollars ($500,000) for
refurbishment and development and/or general improvements at Santa Fe Dam Park.
PP. Seven hundred thirty thousand dollars ($730,000) for
rehabilitation and development at Ume Grove and/or other general park improvements at
Schabarum Park.
QQ. Eight hundred thousand dollars ($800,000) for general
improvements at facilities serving senior citizens in accordance with the following
schedule:
I. Two hundred fifty
thousand dollars ($250,000) for general improvements and/or rehabilitation of senior
citizen facilities in the North County.
ii. Five hundred fifty
thousand dollars ($550,000) for general improvements and/or rehabilitation of senior
citizen facilities in the East Los Angeles area, the San Gabriel Valley, and the Puente
Hills area of the County.
RR. Two million one hundred sixty thousand dollars
($2,160,000) for accessibility improvements, general development, and rehabilitation of
park and recreation facilities serving senior citizens, youth and/or at-risk youth in the
Puente Hills and South County areas, including, but not limited to, Trailview,
Country Wood and Blevins Parks.
SS. Four hundred seventy thousand dollars ($470,000) for
rehabilitation and/or general improvements at Steinmetz Park.
TT. One hundred fifty thousand dollars ($150,000) for
improvement and/or general restoration of trails in the north county.
UU. Two million dollars ($2,000,000) for development,
improvement, and/or rehabilitation of urban park facilities serving the community, youth
and/or at-risk youth in densely populated, highly urbanized areas in the Central area of
the County including, but not limited to, the communities of Athens, Watts, Willowbrook,
and Florence.
VV. One million six hundred fifty thousand dollars
($1,650,000) for development, improvement, and/or rehabilitation of urban park facilities
serving the community, youth and/or at-risk youth in densely populated, highly urbanized
areas in the East Los Angeles area and the San Gabriel Valley.
WW. Six hundred seventy-five thousand dollars ($675,000)
for acquisition, development and improvement of active sports fields at Val Verde Park.
XX. One million two hundred thousand dollars ($1,200,000)
for development of nature center/museum, and/or general improvements at Vasquez Rocks
Regional Park.
YY. Five hundred thousand dollars ($500,000) for
development and/or general improvements at Victoria Park.
ZZ. Three hundred sixty thousand dollars ($360,000) for
refurbishment of the pool and/or facilities at Washington Park.
AAA. Two hundred thousand dollars ($200,000) for general park
and/or security improvements at the Whittier Narrows Nature Center.
BBB. Three million three hundred thousand dollars ($3,300,000)
for refurbishment, development, expansion and/or general improvements at Whittier Narrows
Park.
(2) Seven million dollars
($7,000,000) to the Department of Parks and Recreation for grants to Public Agencies and
Nonprofit Organizations throughout the District on a competitive basis for trails, senior
citizen facilities, urban tree planting, graffiti prevention, rivers and streams, and
acquisition and/or restoration of natural lands.
(3) Seven million dollars
($7,000,000) to the Department of Parks and Recreation for grants to Public Agencies and
Nonprofit Organizations throughout the District on a competitive basis for acquisition,
construction, development and/or improvement of at-risk youth recreation and service
facilities throughout the District for gang prevention purposes.
(4) Four million dollars
($4,000,000) to the Department of Public Works for capital outlay projects to restore and
improve the Santa Monica Bay by measurably reducing the toxicity of and/or pollutant load
in urban runoff to the Bay, and in accordance with the criteria set forth in Section 9 of
this resolution.
(b) Ninety-five million six hundred fifty thousand dollars
($95,650,000) for the acquisition, development, improvement, restoration or rehabilitation
of real property for regional beaches, recreational facilities, parks and park safety,
gang prevention, senior citizen recreation facilities, wildlife habitat, natural lands,
State parks, trail and river systems, mountain ranges and canyons, significant ecological
areas, and museums and cultural facilities in accordance with the following schedule:
(1) Eight million dollars
($8,000,000) to the Department of Beaches and Harbors to acquire, develop or improve
facilities to enhance beaches and public access, improve water quality, rehabilitate or
restore existing facilities and improve the safety of beach facilities along the sixty
miles of coastline within the County, at County-owned or operated beaches.
(2) Eleven million dollars
($11,000,000) to the Department of Parks and Recreation for acquisition of lands for park,
wildlife, natural and open space purposes, and for development of related recreation
facilities and public access in the Baldwin Hills, including an amount not less than seven
million dollars ($7,000,000) for acquisition of lands.
(3) One million dollars
($1,000,000) to the City of Los Angeles for improvement and development of the Cabrillo
Marine Aquarium in accordance with Cabrillo Marine Aquarium Master Plan.
(4) Three hundred fifty
thousand dollars ($350,000) to the Department of Parks and Recreation for development and
improvements at Descanso Gardens.
(5) Twelve million dollars
($12,000,000) to the California Museum of Science and Industry for land acquisition and
improvements within Exposition Park and for improvements to the California Museum of
Science and Industry in accordance with the California Museum of Science and Industry
Exposition Park Master Plan, including an amount not less than eight million five hundred
thousand dollars ($8,500,000) for the development and restoration of lands for park,
recreational, community and open space use, and for walkways, tree-planting and landscape
improvements, all within Exposition Park, including an amount not less than two million
dollars ($2,000,000) for active recreation facilities; an amount not more than two million
dollars ($2,000,000) for the improvement, development, renovation and rehabilitation of
facilities, including exhibition spaces, at the California Museum of Science and
Industry in accordance with the California Museum of Science and Industry Master Plan; and
an amount not less than one million dollars ($1,000,000) for the improvement, development,
renovation and rehabilitation of facilities at the California Afro-American Museum.
(6) Eighteen million dollars
($18,000,000) to the Department of Parks and Recreation for the development, improvement,
restoration and rehabilitation of the Hollywood Bowl, including rehabilitation of
facilities and aging infrastructure, improvement of public access and facilities and
improvement of access for persons with disabilities, in accordance with the approved
Hollywood Bowl Master Plan, and/or for grants to qualified Nonprofit Organizations for
these purposes.
(7) One million four hundred
fifty thousand dollars ($1,450,000) to the Department of Parks and Recreation for the
improvement, restoration and rehabilitation of the Los Angeles Arboretum, and/or for
grants to qualified Nonprofit Organizations for these purposes.
(8) Five million dollars
($5,000,000) to the Department of Natural History Museum for the improvement, development,
restoration and/or rehabilitation of facilities of the Los Angeles County Natural History
Museum, including development of exhibition space, and/or for grants to qualified
Nonprofit Organizations for these purposes.
(9) Twelve million dollars
($12,000,000) to the Mountains Recreation and Conservation Authority (MRCA) for the
acquisition, development, improvement and restoration of lands along the Los Angeles
River, Tujunga Wash, Verdugo Wash, Pacoima Wash, Arroyo Seco, and Compton Creek, and other
tributaries of the Los Angeles River as may be included by the Board, consistent with the
Los Angeles County Los Angeles River Master Plan, for the purposes of providing
recreational opportunities and public access, developing trails for walking, hiking,
bicycling, and equestrian use, and restoring natural habitat for wildlife, along the
entire length of the Los Angeles River and its tributaries (as defined in this paragraph).
The MRCA shall consult with the Department of Public Works and the supervisorial
districts through whose boundaries the Los Angeles River flows in developing the list of
projects to be considered for expenditure of the funds pursuant to this paragraph and to
be submitted to the Board for approval. The Department of Public Works shall review
each proposed project for consistency with the Los Angeles River Master Plan and with the
flood control plan of the Los Angeles River, and shall provide its findings to the MRCA to
be submitted to the Board concurrently with projects submitted to the Board. The
Board shall disapprove a project that it finds to be inconsistent with the Los Angeles
River Master Plan or that it finds will negatively impact existing or proposed flood
control projects. Not less than four million dollars ($4,000,000) shall be allocated
for projects along the Los Angeles River in the Cities of Maywood, Lynwood, Compton and
Bell Gardens, including projects along Compton Creek. First priority for all
expenditures shall be given to land acquisition projects which result in a net increase of
park, recreation and open space lands. No funds shall be expended on projects that
could negatively impact any existing or proposed flood control project as determined by
the Board of Supervisors.
(10) Twelve million dollars
($12,000,000) to the City of Los Angeles for the development, improvement and
rehabilitation of the Los Angeles Zoo. The funds shall be spent on the site of the
Los Angeles Zoo and in accordance with the Los Angeles Zoo Master Plan.
(11) Two million five hundred
thousand dollars ($2,500,000) to the City of Whittier for restoration and rehabilitation
of the Pio Pico State Historic Park, in accordance with the Pio Pico State Historic Park
General Plan.
(12) One million dollars
($1,000,000) to the City of Santa Clarita for the acquisition and development of lands for
the Santa Clara River Park in accordance with the Santa Clara River Water and Recreation
Features Plan.
(13) One million three hundred
fifty thousand dollars ($1,350,000) to the Department of Parks and Recreation for general
improvements to facilities at the South Coast Botanical Gardens.
(14) Ten million dollars
($10,000,000) to the Wildlife Corridor Conservation Authority for acquisition,
improvement, and/or restoration of park and natural lands in the Puente Hills Wildlife
Corridor east of Colima Road.
(c) One hundred thirty-one million five hundred
fifty thousand dollars ($131,550,000) to the Department of Parks and Recreation for grants
to incorporated cities within the District and the County for the acquisition,
development, improvement, rehabilitation or restoration of real property for parks and
park safety, senior recreation facilities, gang prevention, beaches, recreation, community
or cultural facilities, trails, wildlife habitat or natural lands in accordance with the
following schedule:
(1) Thirty-five million
dollars ($35,000,000) for grants to all incorporated cities within the District and to the
County on a per parcel basis, including funds on a per parcel basis to the County for the
unincorporated area of the County.
(2) Ninety-six million five
hundred fifty thousand dollars ($96,550,000) for direct grants to cities in accordance
with the following schedule:
A. Five hundred thousand dollars ($500,000) to the
City of Agoura Hills for the development of a regional community center and gymnasium in
partnership with the City of Calabasas.
B. Six hundred thousand dollars ($600,000) to the
City of Alhambra for the rehabilitation and development of a walking/jogging trail system
at Almansor Park.
C. Two hundred thousand dollars ($200,000) to the
City of Arcadia for the development and refurbishment of a soccer facility at Civic Center
Park.
D. Five hundred thousand dollars ($500,000) to the
City of Artesia for the development of an at-risk youth recreation and service facility.
E. Three hundred fifty thousand dollars ($350,000) to
the City of Avalon for improvement of beaches and the recreational diving park at Casino
Point in accordance with the Avalon Urban Waterfront Restoration Plan.
F. Two hundred thousand dollars ($200,000) to the
City of Baldwin Park for the rehabilitation and/or development of four regionally used
sports fields.
G. Four hundred thousand dollars ($400,000) to the
City of Bellflower for the development of Bellflower's portion of the West Branch Greenway
and Bikeway project.
H. Two hundred fifty thousand dollars ($250,000) to
the City of Beverly Hills for the development and rehabilitation of Beverly Gardens Park.
I. Eight hundred thousand dollars ($800,000) to the
City of Burbank for the development of the Stough Canyon Nature Center Project and to
develop and/or improve camping facilities at Stough Canyon.
J. Five hundred thousand dollars ($500,000) to the
City of Calabasas for the development of a regional community center and gymnasium in
partnership with the City of Agoura Hills.
K. One million one hundred seventy-five thousand
dollars ($1,175,000) to the City of Claremont for the rehabilitation and development of a
community center at the Danbury School site.
L. One million dollars ($1,000,000) to the City of
Covina or to the agency responsible for the operation of Charter Oak Park for development
and improvement of Charter Oak Park.
M. Four million two hundred thousand dollars
($4,200,000) to the City of Cudahy, in cooperation with the City of South Gate, for
acquisition, improvement, and provision of public access for the Los Angeles River
Recreation and Sports Complex adjacent to the Los Angeles River, and for restoration of
riparian habitat.
N. One million six hundred twenty-five thousand
dollars ($1,625,000) to the City of Culver City for development of the Culver City Senior
Center.
O. Three hundred thousand dollars ($300,000) to the
City of Downey for the rehabilitation and improvement of facilities at Rio San Gabriel
Park.
P. Four hundred thousand dollars ($400,000) to the
City of Duarte for rehabilitation of the Duarte Regional Teen Center in partnership with
the City of Bradbury.
Q. One million five hundred thousand dollars
($1,500,000) to the City of El Monte for the development and improvement of the Community
Center/Swimming Pool Complex.
R. Two hundred fifty thousand dollars ($250,000) to
the City of Gardena for the improvement and rehabilitation of park facilities at Rowley
Park.
S. One million six hundred thousand dollars
($1,600,000) to the City of Glendale for the development of the new Senior/Adult
Recreation multi-purpose center.
T. One million four hundred thousand dollars
($1,400,000) to the City of Glendora in accordance with the following schedule:
I. Nine hundred
thousand dollars ($900,000) for the development of a regional teen center.
ii. Five hundred thousand
dollars ($500,000) for the acquisition of wildlife lands and natural habitat in the
Glendora Wildlife Corridor.
U. Two hundred fifty thousand dollars ($250,000) to
the City of Hawaiian Gardens for the expansion, improvement, and rehabilitation of the Lee
Ware Community/Aquatics Facility.
V. Five hundred seventy-five thousand dollars
($575,000) to the City of Hawthorne for the development of Memorial Center Gymnasium.
W. One million dollars ($1,000,000) to the City of
Hermosa Beach for the development, expansion and rehabilitation of the Hermosa Beach
Municipal Pier and Waterfront Plaza.
X. One million seven hundred twenty-five thousand
dollars ($1,725,000) to the City of Inglewood for the development, improvement and
rehabilitation of Centinela Park.
Y. One million dollars ($1,000,000) to the City of La
Mirada for the development of a Community/Senior Citizen Center.
Z. Seven hundred thousand dollars ($700,000) to the
City of La Puente for the development, improvement and/or rehabilitation of the La Puente
Park Community Center with emphasis on facilities for at-risk youth and other community
youth.
AA. Six hundred thousand dollars ($600,000) to the City of
Lakewood in accordance with the following schedule:
I. Three hundred
thousand dollars ($300,000) for the rehabilitation of athletic safety field lights at
three regionally used city facilities.
ii. Three hundred thousand
dollars ($300,000) for the development and rehabilitation of multipurpose courts at the
following city parks: Boyar, Bloomfield, Bolivar, Del Valle and San Martin.
BB. One million eight hundred thousand dollars ($1,800,000)
to the City of Lancaster in accordance with the following schedule:
I. Eight hundred
thousand dollars ($800,000) for the development of the Lancaster Regional Sports Complex.
ii. One million dollars
($1,000,000) for the acquisition of prime desert woodland habitat and the development of
public access to the Lancaster Prime Desert Woodland Preserve.
CC. Two hundred seventy-five thousand dollars ($275,000) to
the City of La Verne to develop and improve the La Verne Regional Sports Parks.
DD. One hundred seventy-five thousand dollars ($175,000) to
the City of Lawndale for the expansion and rehabilitation of Jane Addams Park.
EE. Nine million nine hundred thousand dollars ($9,900,000)
to the City of Long Beach in accordance with the following schedule:
I. Five hundred
thousand dollars ($500,000) for the development and rehabilitation of Belmont Pier.
ii. Two million dollars
($2,000,000) for the rehabilitation of Belmont Plaza Pool including development of
security systems.
iii. Three million five hundred
thousand dollars ($3,500,000) for the development of the Park on Golden in downtown Long
Beach.
iv. Three million nine
hundred thousand dollars ($3,900,000) for the acquisition, development and improvement of
Westside Park..
FF. Thirty million dollars ($30,000,000) to the City of Los
Angeles in accordance with the following schedule:
I. One million dollars
($1,000,000) to improve and restore natural habitat at the Ballona Lagoon Marine Preserve
in accordance with the Ballona Lagoon Marine Enhancement Preserve enhancement plan.
ii. One million eight hundred
thousand dollars ($1,800,000) for the development and improvement of Cabrillo Marine
Aquarium in accordance with the Cabrillo Aquarium Master Plan.
iii. Two million dollars
($2,000,000) for the development and improvement of Compton-Slauson Park.
iv. Five hundred thousand
dollars ($500,000) for the acquisition and/or development of lands for park purposes near
Eagle Rock.
v. One million nine
hundred thousand dollars ($1,900,000) for the development and improvement of park and
recreation facilities at Elysian Park including trails, picnic facilities, playground and
landscaping, in accordance with the Elysian Park Master Plan, Bishop Canyon Improvement
Project.
vi. One million nine hundred
thousand dollars ($1,900,000) for the development, and/or rehabilitation of the Travel
Town Locomotive Pavilion at Griffith Park.
vii. One million eight hundred
thousand dollars ($1,800,000) for the development of facilities and/or improvements
related to the swim lake at Hansen Dam Recreation Area.
viii. Two
million three hundred thousand dollars ($2,300,000) for the development, improvement,
and/or rehabilitation of Housing Authority recreation facilities throughout the City of
Los Angeles, including the San Fernando Valley.
ix. Seven million dollars
($7,000,000) for acquisition, improvement, development and/or rehabilitation of park,
recreation, community and open space lands and/or facilities, and/or for grants to
Nonprofit Organizations for these purposes. Funds shall only be spent in communities
which meet the following criteria: 1) densely-populated, highly urbanized areas; 2) low
per capita percentage of park, recreation, community or open space lands or facilities; 3)
high population of youth, particularly at-risk youth, and where at least 25 percent of the
community is under 18 years of age; and 4) lack of other positive recreation alternatives
for youth. Expenditure of funds shall result in a net increase of park, recreation,
community or open space lands or facilities. Not less than three million five
hundred thousand dollars ($3,500,000) of these funds shall be spent on acquiring land or
facilities for the purposes described in this paragraph. Priority shall be given to
projects which have matching funds, to densely-populated areas, projects which serve
multiple communities, or joint applications from Public Agencies and qualified Nonprofit
Organizations.
x. One million five
hundred thousand dollars ($1,500,000) for development and/or improvements at MacArthur
Park including development of athletic fields.
xi. Five hundred thousand
dollars ($500,000) for the development and/or restoration of trails in the Northern and
Northeast San Fernando Valley connecting to the Angeles National Forest, to be expended by
the Santa Monica Mountains Conservancy as the Public Agency responsible for implementation
of the Rim of the Valley Trail Corridor pursuant to subdivision of Section 33204.3 of the
Public Resources Code.
xii. Two million eight hundred
thousand dollars ($2,800,000) for the development, restoration and/or improvement of
recreation facilities and restoration of natural lands at the Sepulveda Basin Recreation
Area, including an amount not less than one million dollars ($1,000,000) for bicycle
trails connecting to Sepulveda Basin, excluding trails along the Los Angeles River.
Not less than one million dollars ($1,000,000) shall be spent on restoration of the
Sepulveda Basin Wildlife Area and the development of a native plant/wildlife area west of
the existing wildlife area.
xiii. Four
million dollars ($4,000,000) for the acquisition and improvement of land for park and open
space purposes adjacent to and in the vicinity of Stoney Point in the San Fernando Valley,
to be expended by the Santa Monica Mountains Conservancy. Any unexpended portion of
these funds shall be used for acquisition of natural lands and open space within the
wildlife corridor between Brown's Canyon and the Santa Susana Mountains unit of the State
Park System.
xiv. One million dollars
($1,000,000) for development and/or improvement of the Mid-Valley Senior Citizen Center in
the San Fernando Valley.
GG. Nine hundred seventy-five thousand dollars ($975,000)
to the City of Lynwood for the development and improvement of Mervyn M. Dymally
Congressional Park.
HH. Seven hundred thousand dollars ($700,000) to the City
of Malibu for the rehabilitation and restoration of the Malibu Pier.
II. Five hundred thousand dollars ($500,000) to the City of
Manhattan Beach for the development and improvement of the Cultural Arts Community Center.
JJ. Five hundred thousand dollars ($500,000) to the City of
Monrovia for the development and rehabilitation of the Recreation Park Armory Facility.
KK. Four hundred fifty thousand dollars ($450,000) to the
City of Montebello for the development and rehabilitation of the City Park Aquatics
Center.
LL. One million dollars ($1,000,000) to the City of
Monterey Park for the development and rehabilitation of Barnes Park.
MM. One million dollars ($1,000,000) to the City of Norwalk
in accordance with the following schedule:
i. Three hundred
seventy five thousand dollars ($375,000) for the development and improvements to Foster
Street Greenbelt and Regional Trail Connection.
ii. Six hundred twenty five
thousand dollars ($625,000) for the development, rehabilitation, and improvement to the
Norwalk Aquatic Pavilion.
NN. Two million five hundred thousand dollars ($2,500,000)
to the City of Palmdale for the development of the Anaverde Basin/Sports Complex.
OO. Five hundred thousand dollars ($500,000) to the City of
Palos Verdes Estates for the acquisition of land for coastal access, trails and other open
space purposes.
PP. Three hundred thousand dollars ($300,000) to the City
of Paramount for the development of an at-risk youth center located at Progress Park.
QQ. One million nine hundred thousand dollars ($1,900,000)
to the City of Pasadena in accordance with the following schedule:
i. One million dollars
($1,000,000) for the development and rehabilitation of Hahamonga Watershed Park in
accordance with the Hahamonga Park Master Plan.
ii. Nine hundred thousand
dollars ($900,000) for the development and rehabilitation of Brookside Park's Fannie
Morrison Facility for the planned Kidspace Museum.
RR. One million dollars ($1,000,000) to the City of Pico
Rivera for the development and rehabilitation of the Pico Rivera Community Center/Rio
Hondo Park.
SS. Four million dollars ($4,000,000) to the City of Rancho
Palos Verdes for the acquisition of critical natural lands and wildlife habitat in the
vicinity of Portuguese Bend for preservation as open space.
TT. Three hundred thousand dollars ($300,000) to the City
of Redondo Beach for the rehabilitation, development and/or improvement of Seaside Lagoon.
UU. One million dollars ($1,000,000) to the City of Rolling
Hills Estates for the acquisition of natural lands, wildlife habitat, open space and/or
equestrian facilities.
VV. One million dollars ($1,000,000) to the City of
Rosemead for the development of Garvey Park Recreation Center.WW. One hundred fifty
thousand dollars ($150,000) to the City of San Dimas for the development and
rehabilitation of Horsethief Canyon Park Multi-Use Trail System.
XX. Seven hundred thousand dollars ($700,000) for the City
of San Fernando for the development of the Youth Activities Center at Las Palmas Park.
YY. One million seven hundred thousand dollars ($1,700,000)
to the City of San Gabriel for the acquisition and/or development of park and recreation
facilities located adjacent to Smith Park.
ZZ. Two million dollars ($2,000,000) to the City of Santa
Clarita for the development and improvement of the Santa Clarita Valley Regional Park.
AAA. One million seven hundred thousand dollars ($1,700,000) to
the City of Santa Monica for the improvement and rehabilitation of beach and bluff areas
to improve access and to provide improvements for recreational activities. Funds
shall only be used for improvements to beach and park lands.
BBB. Two hundred fifty thousand dollars ($250,000) to the City of
Signal Hill for the development of hiking trails around Signal Hill.
CCC. Two hundred seventy-five thousand dollars ($275,000) to the
City of South El Monte for the development of boxing and weight room facilities at the
Aquatics and Community Fitness Center.
DDD. Four hundred thousand dollars ($400,000) to the City of
South Gate for the development and/or rehabilitation of an at-risk youth center at
Hollydale Industrial Park.
EEE. One million five hundred thousand dollars ($1,500,000) to
the City of Torrance in accordance with the following schedule:
i. Three hundred
thousand dollars ($300,000) for the development of a nature history center and
improvements at Madrona Marsh Nature Preserve.
ii. One million dollars
($1,000,000) for the development of the Sports Complex in Charles H. Wilson Park.
iii. Two hundred thousand dollars
($200,000) for rehabilitation and improvements to the Victor E. Benstead Plunge.
FFF. Four hundred thousand dollars ($400,000) to the City of
Walnut for the development of the Senior Citizens Activity Center.
GGG. One million one hundred thousand dollars ($1,100,000) to the
City of West Hollywood for the development and improvement of the Plummer Park Youth,
Senior and Community Center.
HHH. Three million dollars ($3,000,000) to the City of Whittier
in accordance with the following schedule:
i. Five hundred thousand dollars ($500,000) for the development and
improvement of Parnell Park.
ii. Two million five hundred
thousand dollars ($2,500,000) for the acquisition of natural lands within the Whittier
Hills Wilderness area for preservation of wildlife and natural lands and to provide public
access and trails, to be expended by the Whittier-Puente Hills Conservation Authority.
(d) Twenty-two million seven hundred fifty thousand dollars
($22,750,000) to the Santa Monica Mountains Conservancy, pursuant to Division 23 of the
Public Resources Code and the provisions of this resolution, to acquire sensitive and
critical mountain and canyon lands, streams, wildlife lands, trails and scenic areas, and
to develop parks, trails, public access, senior facilities and camps for at-risk youth in
mountain and canyon areas, including lands and areas in the Santa Monica Mountains and the
San Fernando Valley and San Gabriel Valley foothills, including seventeen million seven
hundred fifty thousand dollars ($17,750,000) for lands and areas in the Santa Monica
Mountains and including five million dollars ($5,000,000) for the Santa Clarita Woodlands
and/or the Rim of the Valley Trail Corridor, with first priority being given to completion
of the Santa Clarita Woodlands Park, and for grants to Nonprofit Organizations pursuant to
Section 33204.2 of the Public Resources Code.
Section 4. (a) The grant funds authorized pursuant to
Section 3 shall be subject to the District's existing application and disbursement
guidelines and procedures to the extent consistent with this resolution and as the same
may be amended from time to time by the Board consistent with this resolution, and to the
guidelines and procedures set forth in this resolution. The Department of Parks and
Recreation shall continue to administer the District's grant application and disbursement
program, and all applicants for a grant disbursed pursuant to Section 3 of this resolution
shall submit an application to the Department of Parks and Recreation for grant
approval. The Department of Parks and Recreation shall notify all affected Public
Agencies as to the date when funds for grants under this resolution will be available,
which shall not be later than July 1, 1997.
(b) The recipient agency of funds for any specific
identified project pursuant to this resolution and the 1992 Order shall hold a public
hearing regarding funding such specific identified project, either individually or as part
of a broader or more general public hearing prior to said agency's application to the
District for use of these funds.
Section 5. (a) The grant funds authorized pursuant to
subsection (c)(1) of Section 3 shall be allocated to cities which were incorporated on or
prior to June 30, 1996, and to the County (representing the unincorporated area of the
District), on the basis of each city's and the unincorporated area's respective total
number of parcels of land (all as of June 30, 1996). Such figures shall be
determined by the Los Angeles County Assessor.
(b) Individual applications for grants pursuant to
subsection (c) (1) of Section 3 shall be submitted to the Department of Parks and
Recreation for approval as to conformity with the requirements of this resolution.
In order to utilize available grant funds as effectively as possible, adjoining
jurisdictions shall be encouraged to combine projects and submit joint applications.
(c) The minimum amount that an applicant may request for
any individual project is fifteen thousand dollars ($15,000). Any agency may
allocate all or a portion of its per parcel share to a regional or state project or
another neighboring jurisdiction and all agencies shall be encouraged to form partnerships
with school districts for park and recreation purposes.
(d) Funds allocated to per-parcel grants pursuant to
subsection (c)(1) of Section 3 shall be available for expenditure not later than July 1,
1997. These funds shall be expended or committed for expenditure by the recipient by
June 30, 2001. Commencing on July 1, 2001, any such grant funds under subsection
(c)(1) of Section 3 which are not expended or committed to expenditure by the recipient
shall be available for allocation to one or more classes of expenditures specified in
Section 3 that the Board deems in its sole discretion to be of the highest priority,
consistent with the purposes of this resolution, and per parcel grant funds that were
originally allocated to incorporated cities shall only be spent within municipalities.
Upon reallocation by the Board, the original recipient of the funds shall have no
further claim to the funds.
(e) (1) Funds allocated to grants for specific
identified projects pursuant to subsections (a)(1), (b) excluding paragraph (9), and
(c)(2) of Section 3 shall be available for expenditure not later than July 1, 1997, and
shall be expended or committed for expenditure by the recipient prior to June 30, 2003.
If these funds are not expended or committed for expenditure prior to June 30,
2003, then, after July 1, 2003 (except as provided in paragraph (2) of this subsection),
the agency to which the funds are originally allocated for a specific identified project
may submit to the Board an alternative plan for expenditure of the funds in accordance
with the purposes of this resolution within the city or area of the District in which
funds were originally authorized to be expended. The Board, in its capacity as
governing body of the District, may approve the plan by a majority vote. If the
revised plan of expenditure is approved by the Board, the reallocated funds shall be
expended or committed to expenditure within three years after Board approval of the new
plan of expenditure, and if not so expended or committed to expenditure within such
three-year period, the funds shall be available to the Board for appropriation and
expenditure within one or more of the classes of expenditures specified in Section 3 that
the Board deems in its sole discretion to be of the highest priority, consistent with the
purposes of this resolution.
The provisions of the foregoing paragraph shall also apply to
funds allocated pursuant to paragraph (9) of subsection (b) of Section 3, except that the
date June 30, 2003, shall instead be June 30, 2005.
(2) The agency to which funds are originally allocated
under subsection (a)(1), (b) excluding paragraph (9), and (c)(2) of Section 3 may submit
to the Board an alternative plan for expenditure of said funds prior to July 1, 2003, only
if one or more of the following conditions exists: (A) that due to natural disasters or
other acts of nature the project is incapable of being carried out at the original
designated site; (B) if an acquisition project, that no lands are for sale or can be
acquired within the original designated project area; (C) that the original specific
identified project will be carried out using an alternate source of funds; or (D) that the
original specific identified project described in Section 3 of this resolution has been
completed for less than the amount allocated. The governing body of the recipient
agency shall adopt a resolution making findings that one or more of the above conditions
exist and the agency shall submit such resolution, together with detailed supporting
documentation of such condition(s), to the Department of Parks and Recreation.
The provisions of the foregoing paragraph shall also apply to
funds allocated pursuant to paragraph (9) of subsection (b) of Section 3, except that the
date June 30, 2003, shall instead be June 30, 2005.
(3) If funds allocated to grants for specific identified
projects pursuant to subsections (a)(1) and (c)(2) of Section 3 are not expended or
committed for expenditure by the recipient prior to June 30, 2003, and if an alternative
plan for expenditure is not submitted to the Board prior to June 30, 2004, these funds
shall be available to the Board for appropriation and expenditure within one or more of
the classes of expenditures specified in Section 3 that the Board deems in its sole
discretion to be of the highest priority, consistent with the purposes of this resolution.
Section 6. (a) Funds allocated to the City of Los
Angeles pursuant to paragraphs (3) and (10) of subsection (b) of Section 3, and to the
City of Santa Clarita pursuant to paragraph (12) of subsection (b) of Section 3 shall be
subject to all of the provisions of this resolution which apply to the funds allocated
pursuant to subsection 3(c). Funds allocated to the City of Whittier pursuant to
paragraph (11) of subsection 3(b) shall be subject to all of the provisions of this
resolution which apply to the funds allocated pursuant to subsection 3(c), and the City of
Whittier shall demonstrate to the satisfaction of the Department of Parks and Recreation
that the State has authorized the City to expend such funds at the Pio Pico State Historic
Park, and provided that the City has obtained all necessary approvals for such project; if
the City of Whittier is unable to satisfy the conditions in this sentence, the funds shall
be allocated for expenditure within the Whittier Hills in accordance with Section
3(c)(2)(HHH)(ii).
(b) If the City of Los Angeles elects to expend the funds
allocated in subsection (c)(2)(FF)(iii) of Section 3 pursuant to an agreement with another
Public Agency, the District shall grant these funds directly to said Public Agency,
provided that the City of Los Angeles shall certify the long-term recreational use of the
improvements. The funds allocated to the City of Los Angeles in subsection
(c)(2)(FF)(iv) of Section 3 shall be expended by the Santa Monica Mountains Conservancy as
the public entity responsible for implementation of the Rim of the Valley Trail Corridor
Master Plan pursuant to subdivision (c) of Section 33204.3 of the Public Resources Code.
Section 7. (a) The funds allocated in subsections
(a)(2) and (a)(3) of Section 3 shall be available as grants on a competitive basis to
Public Agencies and Nonprofit Organizations. The funds shall be encumbered by the
recipient within three years of the date when such grants are awarded. The
Department of Parks and Recreation shall allocate a share of such competitive funds for
expenditure in the unincorporated area of the District using the same procedures specified
in subsection (a) of Section 5. The funds allocated pursuant to subsection (a)(2) of
Section 3 for competitive grant programs shall be divided equally among the respective
purposes specified therein, consistent with the procedures developed by the District for
similar competitive grant funds pursuant to the 1992 Order.
(b) Competitive funds allocated pursuant to Section 3 and
the 1992 Order shall be made available on a regular annual basis until all such funds are
encumbered, and the Department of Parks and Recreation shall notify affected Public
Agencies and Nonprofit Organizations of the availability of such funds.
Organizations representing ten or more cities shall be given the opportunity by the
Department of Parks and Recreation to be fairly represented in the evaluation process
established by the Department of Parks and Recreation pursuant to the 1992 Order to
evaluate all competitive grant applications. For all competitive grants awarded
pursuant to Section 3 and the 1992 Order to Nonprofit Organizations and to Public Agencies
from a city with a population of 100,000 or less, costs eligible for reimbursement shall
include reasonable costs of preparation of documents needed to apply to the District for
the grant, including costs of biological assessments required pursuant to subsection (c)
of Section 8, up to three percent (3%) of the total grant amount awarded. In each
year that competitive grant funds are available, an amount not less than two and one-half
percent (2.5%) of funds available to the District in that year for administrative purposes
shall be expended by the District through grants or contracts to independent firms or
qualified Nonprofit Organizations for the purpose of providing a technical assistance
program to Public Agencies and Nonprofit Organizations throughout the District in
preparation of competitive grant requests. The District shall prepare said technical
assistance program for Board approval. The Board shall have the ability to adjust
the percentage of funds used for said purposes if it determines that the level of funding
required to provide the Board-approved technical assistance program is less than the
stated percentage. Two hundred fifty thousand dollars ($250,000) of the amount
allocated for competitive grants for trails shall be allocated to the Santa Monica
Mountains Conservancy for expenditure within the Rim of the Valley Trail Corridor, and two
hundred fifty thousand dollars ($250,000) of the amount allocated for competitive grants
for trails shall be allocated to the Santa Monica Mountains Conservancy for expenditure
within the Santa Monica Mountains.
(c) All other criteria
being equal, priority for allocation of any competitive grants under this resolution shall
be given to those cities, and to Nonprofit Organizations applying jointly with those
cities, which are not designated recipients of funds for specific identified projects in
subsection (c)(2) of Section 3 of this resolution or subsection (b)(2) of Section 8 of the
1992 Order. Any city or Nonprofit Organization which would otherwise be entitled to
a priority under this subsection (c) shall not be entitled to such priority after it has
been awarded a competitive grant under this resolution or the 1992 Order.
(d) In awarding competitive
grants, priority shall be given to those proposals which provide for the employment of
youth, and particularly at-risk youth, from the area in which the proposed project is
located, or which include or are to be administered by a Nonprofit Organization with a
demonstrated history of youth employment, gang prevention and intervention, and training
programs for at-risk youth, including local community conservation corps and the
California Conservation Corps. Such priority shall give due consideration to the
employment of female, as well as male, at-risk youth. In furtherance of this goal,
the Board may adopt such rules and regulations, and impose such conditions on the
recipients of funds under this resolution and the 1992 Order, as the Board may determine
to be necessary or appropriate.
(e) One or more individual jurisdictions may enter
into an agreement with one or more Public Agencies or Nonprofit Organizations for the
purpose of carrying out a grant pursuant to this Section, subject to the requirements of
Sections 10 and 11.
Section 8. (a) Funds allocated for competitive grants for
rivers and streams pursuant to subsection (a)(2) of Section 3 and the 1992 Order shall be
available on a competitive basis as grants to Public Agencies and Nonprofit Organizations
for the restoration, rehabilitation or acquisition of natural lands and the development of
recreational resources along rivers and
streams in the County, including the Santa Clara, San Gabriel and Los Angeles Rivers or
their tributaries. These funds shall be used only for the acquisition and/or
restoration of lands for natural habitat, wildlife enhancement, and/or development of
compatible recreational resources. No less than sixty percent (60%) of funds available for
competitive grants for rivers and streams pursuant to subsection (a)(2) of Section 3 shall
be used for acquisition, restoration and rehabilitation of natural lands along these
rivers and streams. Remaining funds shall be available for development of
recreational resources compatible with any existing or restored natural habitat.
(b) Funds allocated for competitive grants pursuant to
subsection (a)(3) of Section 3 shall be available as competitive grants for at-risk youth
recreation and service facilities only for projects which demonstrate at least sixty
percent (60%) usage of the facilities by at-risk youth. The foregoing restriction
shall also apply to funds allocated under the 1992 Order for competitive grants for
at-risk youth recreation and service facilities. Priority for these grants shall be
given to those applications which demonstrate equal attention to the specific needs of
girls and boys. An amount not less than five hundred thousand dollars ($500,000)
shall be granted to the Department of Children and Family Services for development and/or
improvement of at-risk youth recreation and service facilities at MacLaren Hall. An
amount not less than two million five hundred thousand dollars ($2,500,000) shall be
allocated to the Mountains Recreation and Conservation Authority for acquisition and
development of an at-risk youth camp in the Whittier Puente Hills east of Colima Road for
the use of, and accessible to, at-risk youth from densely-populated, highly-urbanized
areas with a high population of at-risk youth and with low per capita percentage of park,
recreation, community or open space lands or facilities.
(c) Funds allocated for competitive grants for acquisition
and/or restoration of natural lands pursuant to subsection (a)(2) of Section 3 shall be
available on a competitive basis as grants to Public Agencies and Nonprofit Organizations
for the acquisition, improvement and/or restoration of natural lands including but not
limited to coastal sage scrub, desert, coastal dunes, coastal prairies, chaparral, vernal
pools, oak woodlands, forests and native grasslands habitat. Applications for these
grant funds shall include a biological assessment of the site including current and
historical information, a restoration plan and a long-term habitat management plan.
Applicants shall provide documentation of consultation with experts in conservation
biology and natural habitat restoration and shall provide documentation that said plans
and assessments have been reviewed by these experts.
Section 9. (a) Funds authorized pursuant to
subsection (a) (4) of Section 3 shall be available for grants to Public Agencies and shall
be expended only for capital outlay projects which meet one or more of the following
criteria: (1) protect public health in recreational waters; (2) preserve and enhance the
ecological integrity of significant watersheds containing Significant Ecological Areas;
(3) are Best Management Practices as defined in the Storm Water NPDES permit for the
County and approved by the Executive Officer of the Los Angeles Regional Water Quality
Control Board; and (4) reduce runoff into Santa Monica Bay where the runoff travels across
lands that contribute large amounts of toxic pollutants to the storm drain system, or
measurably reduce the toxicity of that runoff. Proposed projects shall be submitted
to the Regional Water Quality Control Board for review and approval.
(b) The Department of Public Works shall prepare, and
submit to the Board for approval, a timeline and proposed criteria and procedures for
evaluating grants authorized pursuant to subsection (a)(4) of Section 3 of this resolution
(and subsection (a)(6) of Section 8 of the 1992 Order) no later than March 30, 1997.
The Regional Water Quality Control Board shall in a public process review and give
final approval to the criteria and procedures for evaluating these grants.
Section 10. No funds authorized under Section 3 may be
disbursed to any recipient unless the recipient agrees:
(a) To maintain and operate
in perpetuity the property acquired, developed, improved, rehabilitated or restored with
the funds. With the approval of the granting agency, the recipient or its successors
in interest in the property may transfer the responsibility to maintain and operate the
property in accordance with this Section.
(b) To use the property only
for the purposes of this resolution and to make no other use, sale, or disposition of the
property, except as provided in Section 11.
(c) Any beach, park or other
public facility acquired, developed, rehabilitated or restored with funds derived under
this resolution shall be open and accessible to the public without discrimination as to
race, color, sex, sexual orientation, age, religious belief, national origin, marital
status, physical or medical handicap, medical condition, or place of residence, to the
extent consistent with the provisions of Section 13. The recipient shall not
discriminate against, or grant preferential treatment to, any person or organization
seeking to use such facility based upon the place of residence of such person or the
members of such organization.
(d) To comply with each
applicable requirement of Section 103 and Sections 141 through 150 of the Internal Revenue
Code of 1986, as amended, to the extent necessary to maintain the exclusion from gross
income for federal income tax purposes of the interest on any bonds, notes, or other
evidences of indebtedness issued to finance such disbursement of funds to such recipient.
The conditions specified in paragraphs (a), (b), (c) and (d) of
this Section shall not prevent the transfer of property acquired, developed, improved,
rehabilitated or restored with funds authorized pursuant to Section 3 of this resolution
from the recipient to another Public Agency, to a Nonprofit Organization authorized to
acquire, develop, improve, restore and/or operate real property for park, wildlife,
recreation, community, open space or gang prevention and intervention purposes, or to the
National Park Service, provided that any such successor to the recipient assumes the
obligations imposed by such conditions.
Section 11. (a) Before the use of any property
acquired, developed, improved, rehabilitated or restored through a grant pursuant to this
resolution is changed to one other than a use permitted under the category from which the
funds were provided, or the property is sold or otherwise disposed of, the recipient of
said funds must hold a public hearing relative to such proposed change in use or sale or
other disposition of said property, and at the conclusion of such public hearing, the
recipient must adopt a finding that the proposed change in use or sale or other
disposition of said property will further the purposes of this resolution. If the
recipient adopts such a resolution and proceeds with the change in use or sale or other
disposition of said property, an amount equal to the greater of (1) the amount of the
grant, (2) the fair market value of the real property, or (3) the proceeds from the
portion of such property acquired, developed, improved, rehabilitated, or restored with
the grant, shall be used by the recipient, subject to Section 10, for a purpose authorized
in the category to which the funds were originally allocated or shall be reimbursed to the
Parks Fund and be available for appropriation only for a use authorized in that category.
If the property sold or otherwise disposed of is less than the
entire interest in the property originally acquired, developed, improved, rehabilitated or
restored with the grant, an amount equal to the proceeds or the fair market value of the
property interest sold or otherwise disposed of, whichever is greater, shall be used by
the recipient, subject to Section 10, for a purpose authorized in the category to which
the funds were originally allocated or shall be reimbursed to the Parks Fund and be
available for appropriation only for a use authorized in that category.
(b) Nothing in this Section shall limit a grantee from
transferring property acquired pursuant to this resolution to the National Park Service or
the State Park System, with or without consideration.
Section 12. (a) All real property acquired pursuant
to this resolution shall be acquired in compliance with Chapter 16 (commencing with
Section 7260) of Division 7 of Title 1 of the California Government Code. Public
Agencies and Nonprofit Organizations receiving funds under this resolution shall certify
compliance to the Department of Parks and Recreation. Funds
disbursed to a Public Agency under this resolution may be expended by that receiving
Public Agency, or by a joint exercise of powers entity established pursuant to Article 1
(commencing with Section 6500) of Chapter 5 of Division 7 of Title 1 of the Government
Code pursuant to an agreement with such receiving Public Agency.
(b) For purposes of this resolution, the term
"acquisition" includes gifts, purchases, leases, easements, the exercise of
eminent domain if expressly authorized, the transfer or exchange of property of like
value, transfers of development rights or credits, and purchases of development rights and
other interests.
(c) All grants, gifts, devises, or bequests to the
District, conditional or unconditional, for park, conservation, recreational, community,
cultural, wildlife habitat, natural lands or other purposes for which real property may be
acquired or developed pursuant to this resolution, shall be made in the name of the County
and accepted and received on behalf of the District in the name of the County by the
Board. The grants, gifts, devises or bequests shall be available for expenditure for
the purposes specified in Section 3.
Section 13. Reasonable public access to lands acquired in
fee with funds made available pursuant to this resolution shall be provided except where
that access may interfere with resource protection. "Reasonable public
access" includes, but is not limited to, parking and public restrooms.
Section 14. All funds of the District allocated to projects
which include tasks that can be performed by youth, including but not limited to the
rehabilitation, restoration and/or development of beach, park, recreation, open space
and/or natural lands, and recreation and community facilities, shall be used to the
maximum extent feasible to employ at-risk youth from the community in which the particular
project is being carried out. In furtherance of the goal of increasing employment
opportunities for at-risk youth, the Board may adopt such rules and regulations, and
impose such conditions on recipients of funds under the 1992 Order and this resolution, as
the Board may determine to be necessary or appropriate.
Section 15. To the maximum extent feasible, Public Agencies
and Nonprofit Organizations shall be encouraged to use funds received pursuant to this
resolution to provide funding through agreements with community conservation corps, the
California Conservation Corps, and with other community organizations, particularly when
youth can be employed to work on restoration or rehabilitation projects being carried out
in their own communities. Such agreements shall be entered into solely for the
accomplishment of the purposes set forth in this resolution.
Section 16. Prior to recommending the acquisition of lands
that are located on or near tidelands, submerged lands, swamp or overflowed lands, or
other wetlands, whether or not those lands have been granted in trust to a local Public
Agency, any agency receiving funds pursuant to this resolution shall submit to the State
Lands Commission any proposal for the acquisition of those lands. The State Lands
Commission may, at its discretion, within ninety (90) days after such a submission, review
the proposed acquisition, make a determination as to the State's existing or potential
interest in the lands, and report its findings to the entity making the submission and to
the Department of Parks and Recreation.
Section 17. (a) Funds that are granted pursuant to Section
3 for the purposes of development, improvement, rehabilitation and/or restoration shall be
expended for these purposes only on lands owned by the applicant Public Agency or
Nonprofit Organization or subject to a lease or other interest held by such Public Agency
or Nonprofit Organization. If such lands are not owned by the applicant or subject
to such other interest held by the applicant, the applicant shall first demonstrate to the
satisfaction of the administering agency that the project will provide public benefits
commensurate with the type and duration of the interest in land held by the applicant.
(b) No wetlands or riparian habitat acquired pursuant
to this resolution shall be used as a dredge spoil area or shall be subject to revetment
which damages the quality of the habitat for which the property was acquired.
(c) Any restoration of natural habitat lands restored
pursuant to this resolution and the 1992 Order shall use only species native to California
to the maximum extent feasible. Funds allocated pursuant to Section 3 that are used
for landscaping, planting trees or any other planting projects shall use drip irrigation
or other water conserving irrigation systems and shall use drought-resistant or xerophytic
trees, plants, lawn or sod, except when such use can be shown to be infeasible. When
projects involve the rehabilitation of existing irrigation systems or the creation of new
irrigation systems, reclaimed water should be used whenever possible and priority shall be
given to development of reclaimed water irrigation systems. Any recipient of funds
for planting on natural lands shall make every effort to use only plant species and
vegetation types which are appropriate to the local ecosystem of the site.
(d) Notwithstanding subsection (e) of this Section, the
development of recreational resources or facilities pursuant to this resolution and the
1992 Order shall not degrade the natural values present or being restored along rivers,
tributaries and wetlands, nor shall they be used for flood control projects.
(e) Any project funded pursuant to this resolution and the
1992 Order shall include sufficient funds to mitigate damage done to natural lands as a
result of said project as otherwise required by law.
(f) No funds shall be used to pay for mitigation which is
required to be carried out by state or federal law in connection with a project or
activity which is not funded pursuant to this resolution or the 1992 Order.
Section 18. No provision of this resolution shall be
construed as authorizing the condemnation of publicly-owned lands.
Section 19. Funds provided to the Santa Monica Mountains
Conservancy shall be held and disbursed by the District and, upon application by the
Conservancy, shall be expended solely for projects approved by the Board, pursuant to such
criteria as the Board may in its discretion adopt; provided, that said funds shall be for
projects identified in the annual work program of the Conservancy transmitted to the
Governor and the Legislature pursuant to paragraphs (1) and (2) of subdivision (a) of
Section 33208 of the Public Resources Code, as amended from time to time after a noticed
public hearing, and provided that the Board may disapprove a project in an incorporated
city only upon a finding that the acquisition or improvement of a project will involve the
acquisition of or access to a site identified or proposed for present or potential future
sanitary landfill purposes by the County, or involve any other land or project which may
directly or indirectly hinder or impact the ability of the County to use any site so
identified for such purposes. All land acquired in whole or in part with funds
allocated to the Conservancy hereunder shall be purchased from willing sellers, and in no
event shall funds allocated to the Conservancy hereunder be used to pay or reimburse the
purchase price of land acquired through the exercise of the power of eminent domain.
Disbursement of funds pursuant to subsection (d) of Section 3 shall be governed by
the procedures specified for the 1992 order in the order of the Board dated March 29,
1994, and such method of disbursement shall continue to apply to the 1992 Order and to
funds provided pursuant to this resolution, except that funds shall be expended within
five years of disbursement.
Section 20. If funds are allocated in a citywide measure
adopted by the City of Los Angeles in 1996 for any project located at the site of a
project identified in subsections (c)(2)(FF)(i) through (xiv), inclusive of Section 3, and
in subsection (b)(3) or (b)(10) of Section 3, the funds allocated in this resolution for
that project may be reallocated by the Board for another project with regional recreation
or open space benefit consistent with the purposes of this resolution within the City of
Los Angeles. Such project shall be approved by the City Council of the City of Los
Angeles.
Section 21. (a) The Department of Parks and
Recreation shall administer for the District all funds for the projects and programs
described in this resolution. Administrative costs eligible for funds available for
project planning and design of projects funded pursuant to this resolution and the 1992
Order shall include project design and inspection when said inspection is required by the
agency responsible for carrying out the project. In any year, a recipient agency may
utilize an amount not more than one percent (1%) of the funds which it is eligible to
receive under subsection (b) of Section 23 for reimbursement of accounting and bookkeeping
costs as applicable overhead to pay for compliance with the District's accounting and
reporting requirements.
(b) Consistent with subsection (a) of Section 23, proceeds
of the Additional Assessment shall be used for: (i) costs of maintenance and servicing of
projects funded by the District (whether such projects were funded through the application
of cash proceeds of assessments or proceeds of bonds, notes or other evidences of
indebtedness issued by the District in accordance with this resolution or the 1992 Order)
or otherwise acquired pursuant to this resolution, (ii) payment of actual administrative
costs associated with carrying out the purposes of the District, by the District and
recipient Public Agencies, and (iii) either to pay directly the costs of projects
authorized pursuant to this resolution or the 1992 Order, or to pay debt service on any
bonds, notes or other evidences of indebtedness of the District.
(c) It is the intention of the District to issue bonds,
notes or other evidences of indebtedness, to fund all or a portion of the costs of the
projects listed in Section 3 of this resolution. Such bonds, notes or other
evidences of indebtedness may be issued in one or more series at such times and in such
principal amounts as the Board may determine in its sole discretion.
(d) All proceeds of the Additional Assessment shall be
deposited into the Parks Fund established pursuant to the 1992 Order. The
Auditor-Controller of the County, on behalf of the District, may create any other funds,
accounts or subaccounts necessary or desirable to account for the funds of the District,
including the proceeds of assessments and bonds, notes and other evidences of indebtedness
issued by the District.
(e) In accordance with the 1992 Order, all revenue
generated by the District, including the proceeds from the issuance of any bonds, notes or
other evidences of indebtedness, shall be deposited in the Parks Fund and shall be
allocated among all affected Public Agencies within the District as defined in Section
5506.9 of the California Public Resources Code, for expenditure consistent with the
purposes of Division 5, Chapter 3, Article 3 of said Public Resources Code and of the 1992
Order and this resolution. The County shall be reimbursed from the Parks Fund for
the actual costs of administration of the District and the costs of issuance of bonds,
notes or other evidences of indebtedness by the District.
(f) If the County purchases a surety bond to replace cash
in a debt service reserve fund, either before or after bonds are issued, the cash so
replaced shall be allocated in the same manner described in Section 24.
(g) No proceeds of any bonds, notes or other evidences of
indebtedness issued by the District shall be used for any operations, maintenance or
servicing purposes, except that such proceeds may be used to pay all costs incidental to
the preparation and issuance of bonds, notes or other evidences of indebtedness of the
District.
(h) The amounts of all allocations designated in Section 3
are net amounts, and shall not be reduced for administrative costs of the District.
(i) The District shall contract for an independent audit to
be conducted annually by an independent auditing firm for the purposes of determining
compliance by the District with the terms of this resolution and the 1992 Order, and to
report on the status of all expenditures, grants and contracts as of the end of each
fiscal year, including all fund balances; such audit to be completed and such auditor's
report to be issued by January 1 of the following year. The Board may establish by
resolution the scope of the annual audit which may include among other things an audit of
the funds received and expended pursuant to this resolution and the 1992 Order by any
recipient agency, including but not limited to the Department of Parks and Recreation, the
Santa Monica Mountains Conservancy, the City of Los Angeles and the Department of Beaches
and Harbors.
(j) The District shall manage its revenues and issue debt
in a manner so as to ensure that sufficient funds are available in accordance with the
terms of the Master Indenture to finance all capital outlay projects specified in Section
3 of this resolution and in Section 8 of the 1992 Order by the end of fiscal year 2008-09,
and shall annually prepare a Plan of Revenues and Expenditures for the entire life of the
1992 Assessment and the Additional Assessment which demonstrates such availability of
funds. The annual Plan of Revenues and Expenditures shall be prepared following
completion of the annual audit referred to in subsection (i) of this Section and shall be
adopted by the Board prior to June 30 of each year. In preparing the Plan of
Revenues and Expenditures the District shall consult with an independent Financial
Consultant, and may incorporate directly or by reference all or any portion of the
engineer's report prepared by the District for that fiscal year.
Section 22. The Additional Assessment shall be levied for a
period of twenty-two (22) years beginning with the fiscal year in which such Additional
Assessment is first levied and collected by the District.
Section 23. (a) In each of the first twenty (20)
years after the date the Additional Assessment is first levied and collected, a minimum of
eighty percent (80%) of all proceeds of the Additional Assessment levied and collected by
the District shall be used for capital outlay projects, including, but not limited to,
acquisition and improvement of real property. For purposes of this resolution,
capital outlay projects include the servicing of bonds, notes or other evidences of
indebtedness issued by the District.
(b) On an annual basis, fifteen percent (15%) of all
proceeds of the Additional Assessment and the 1992 Assessment (or such greater percentage
of the proceeds of the Additional Assessment and the 1992 Assessment, not to exceed twenty
percent (20%), as determined by the Board) shall be set aside and designated as the
maintenance and servicing amount, and shall be used only to maintain and service capital
outlay projects funded by the District pursuant to the 1992 Order and this resolution.
Such maintenance and servicing amount of the Additional Assessment and the 1992
Assessment shall be allocated each year as follows: (1) to the County (for the benefit of
the Department of Parks and Recreation, or the Department of Beaches and Harbors, or any
other applicable department as determined by the Board), an amount obtained by multiplying
the aggregate amount of such maintenance and servicing funds to be allocated for such year
by a fraction, the numerator of which is the number of parcels of land in the
unincorporated area of the County and the denominator of which is the total number of
parcels of land in the County; (2) to the Santa Monica Mountains Conservancy, or any other
agency designated by it to manage properties acquired pursuant to this resolution or the
1992 Order by the Conservancy or any joint powers entity to which the Conservancy is a
party which has acquired properties pursuant to the 1992 Order or this resolution, a
percent of the total maintenance and servicing funds that equals the percent of the total
capital outlay funds that are allocated to and/or to be expended by the Santa Monica
Mountains Conservancy and Mountains Recreation and Conservation Authority pursuant to
Section 3 of this resolution; and (3) except as provided in the next paragraph, to each
incorporated city within the District, an amount obtained by multiplying the maintenance
and servicing funds remaining after the allocations described in the preceding clauses (1)
and (2) by a fraction, the numerator of which is the number of parcels of land in such
city and the denominator of which is the total number of parcels of land in the
incorporated areas of the County. Of the maintenance and servicing funds allocated
to the County in this resolution and the 1992 Order, the Department of Beaches and Harbors
shall be allocated an amount obtained by dividing the total amount of funds allocated to
the Department of Beaches and Harbors in this resolution and the 1992 Order by the total
amount of funds allocated for specific identified projects and for per parcel grants to
the Department of Parks and Recreation in this resolution and the 1992 Order. On an
annual basis, one million seven hundred thousand dollars ($1,700,000) shall be deducted
from the maintenance and servicing funds allocated to the City of Los Angeles in this
resolution and the 1992 Order, and such amount shall be used to pay debt service on bonds,
notes or other evidences of indebtedness issued to fund the project described in Section
8(b)2.V.x of the 1992 Order. In the event of an inconsistency between this Section
and Section 23 of the 1992 Order, this Section shall prevail.
The allocations described in this Section 23 shall be made only
to those recipients which certify that (1) such funds shall be used only to maintain and
service projects funded by the District pursuant to this resolution or the 1992 Order, and
(2) such funds shall be used to supplement existing levels of service and not to fund
existing levels of service.
(c) If operation and maintenance and/or ownership of the
County's beaches are transferred to a non-County entity in the future, the funds allocated
pursuant to this section for maintenance and servicing of the County's beaches shall be
re-allocated by the Board for maintenance and servicing of projects funded by this
resolution or the 1992 Order.
Section 24. (a) To the extent permitted by
applicable law and not inconsistent with the other provisions of this resolution, in each
fiscal year, as determined by the independent audit conducted pursuant to subsection (i)
of Section 21, a portion of the excess of (1) assessment revenues collected pursuant to
this resolution and the 1992 Order plus investment earnings thereon, and any other
revenues of the District (excluding bond proceeds or any other evidences of indebtedness,
but including collections of delinquent assessments and interest and penalties thereon),
all cumulative to the date of the independent audit, over (2) amounts expended for capital
outlay (excluding capital outlay funded with bond proceeds or other borrowed funds), and
amounts expended or allocated for maintenance and servicing, administrative costs and debt
service, all cumulative to the date of the independent audit (such excess being
hereinafter referred to as the "Excess"), shall be allocated by the Board for
grants in furtherance of the purposes of this resolution and the 1992 Order. The
independent Financial Consultant referred to in subsection (j) of Section 21 shall
annually determine what portion of the Excess from the prior year may be made available in
the next fiscal year pursuant to this Section 24 without impairing the ability of the
District to finance all capital outlay projects specified in Section 3 of this resolution
and in Section 8 of the 1992 Order by the end of fiscal year 2008-09 and without impairing
the District's ability to issue or repay bonds, notes or other evidences of indebtedness
(such amount being hereinafter referred to as the "Available Excess"). The
independent Financial Consultant shall make a recommendation as to the Available Excess to
the District for its use in preparing the annual Plan of Revenues and Expenditures
referred to in subsection (j) of Section 21. In each year, 80% of the Available
Excess as identified in the Plan of Revenue and Expenditures approved by the Board shall
be allocated by the Board pursuant to this section and in accordance with the following
schedule (to the extent permitted by applicable law and not inconsistent with the other
provisions of this resolution): 80% shall be allocated for capital projects and 20% shall
be allocated for maintenance and servicing of those capital projects.
(b) Over the life of the 1992 Assessment and the Additional
Assessment, a total of ten percent (10%) of the funds expended for capital outlay pursuant
to subsection (a) shall be allocated for competitive grants pursuant to subsections (a)(2)
and (a)(3) of Section 3, which shall be allocated equally among each supervisorial
district; the remainder of the funds to be expended pursuant to subsection (a) of this
Section shall be equally distributed between the category of highest priority regional
open space and recreation projects (as defined in this Section) and the category of
regional park and recreation facilities (as determined by the District). Of the
annual amount of funds allocated pursuant to this Section, capital funds shall be
available only to those agencies which have expended or committed to expenditure the
capital funds allocated to said agencies in any category of expenditure under this
resolution and the 1992 Order, except that the amount available for the category of
regional park and recreation facilities shall be equally distributed between grants to the
County and incorporated cities. Grants to incorporated cities shall be made only to
those cities that have expended or committed to expenditure all funds allocated to them in
all categories of expenditure under this resolution and the 1992 Order. In any year,
first priority for expenditure of funds under this section shall be given to land
acquisition projects. Capital funds not encumbered in any fiscal year shall be available
for reallocation by the Board, pursuant to this section, in the subsequent annual
allocation.
(c) For purposes of this section, "highest priority
regional open space and recreation projects" shall mean projects for the purposes of
and expended by the agencies identified in subsections (b)(2), (b)(9), (b)(14), and (d) of
Section 3, including the Santa Clarita Woodlands, and for projects along Ballona Creek
consistent with the purposes and conditions specified in subsection (b)(9).
Section 25. Individuals who qualify for the California
Property Tax Postponement Program (Sections 20581 et seq. of the California Revenue and
Taxation Code) may also qualify for postponement of the Additional Assessment. The
Treasurer and Tax Collector of the County shall notify those individuals who have
qualified for the Property Tax Postponement Program of this provision.
Section 26. The method of assessment contained in the
Engineer's Report with respect to the 1992 Assessment is hereby amended to the extent and
with the effect that the portion of any vacant parcel of land, and the vacant portion of
any partially improved parcel of land, in excess of two and one-half acres shall not be
assessed. Notwithstanding any discrepancies, differences or variations between the
Engineer's Report with respect to the 1992 Assessment and the Engineer's Report with
respect to the Additional Assessment, it is the intent of this resolution that the method
of assessment with respect to both the 1992 Assessment and the Additional Assessment shall
be identical in all respects. Any such discrepancies, differences or variations in
the method of assessment shall be resolved in favor of the Engineer's Report with respect
to the Additional Assessment.
Section 27. Any revenue generated by the District
(including the proceeds of any indebtedness of the District) which is available for
capital outlay purposes, may be applied to fund any project contemplated under the 1992
Order or this resolution. In furtherance of this provision, proceeds of the 1992
Assessment which are to be applied to capital outlay purposes may be applied to fund
projects under this resolution, and proceeds of the Additional Assessment which are to be
applied to capital outlay purposes may be applied to fund projects under the 1992 Order.
In addition, any proceeds of the 1992 Assessment or the Additional Assessment which
are to be applied to capital outlay purposes may be applied to pay the principal of, or
interest on, any bonds, notes or other indebtedness of the District, regardless of the
time of issuance or the use of the proceeds of such bonds, notes or indebtedness.
Section 28. In case any provision of this resolution shall
be invalid, illegal or unenforceable, the validity, legality and enforceability of the
remaining provisions of this resolution shall not in any way be affected or impaired
thereby.
Section 29. This resolution shall not take effect unless
approved by a majority of the voters of the County voting on the matter at a general or
special election called by the Board for such purpose. If so approved by the voters,
this resolution shall take effect, and the Additional Assessment shall exist and be deemed
approved, all as of the date of the election, without regard to the date of certification
of the election results.
Section 30. The officers and employees of the County and ex
officio the officers and employees of the District, are and each of them acting alone is,
hereby authorized and directed to take any and all actions which are necessary or
desirable to carry out the purposes of this resolution and the 1992 Order.
Section 31. The County Counsel is hereby authorized and
directed to prepare a final text of this resolution, incorporating all amendments to the
version on file with the Clerk of the Board on June 13, 1996, and approved by the Board,
including appropriate paragraph numbering and/or lettering, cross references and other
technical or conforming changes as County Counsel may deem necessary or desirable to carry
out the Board's intent and for clarity and ease of reading. Technical and conforming
changes shall include but not be limited to the insertion of new paragraphs in the
appropriate place with an appropriate numerical or letter designation and the renumbering
or re-lettering of other subsections and paragraphs to reflect the insertion, together
with the updating of cross-references to such renumbered and re-lettered subsections and
paragraphs in other portions of the resolution.
Section 32. The list of improvements in the Final
Engineer's Report is amended to conform with descriptive and fiscal changes made to
projects in Section 3 of this resolution.
The foregoing
resolution was on the 18th day of June, 1996, adopted by the Board of Supervisors of the
County of Los Angeles and ex-officio the governing body of all other special assessment
and taxing districts, agencies and authorities for which said Board so acts.
JOANNE STURGES, Executive Officer-Clerk of
the Board of Supervisors of the County of Los
Angeles
By: _______________________________
Deputy
APPROVED AS TO FORM:
DE WITT W. CLINTON
County Counsel
By: _______________________________
Principal Deputy County Counsel
|